Bump github.com/prometheus/client_golang from 1.12.2 to 1.17.0 #460
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
Annotations
9 errors
Test (postgres:12)
Process completed with exit code 2.
|
Test (postgres:13)
The job was canceled because "postgres_12" failed.
|
Test (postgres:13)
Process completed with exit code 2.
|
Test (postgres:11)
The job was canceled because "postgres_12" failed.
|
Test (postgres:11)
The operation was canceled.
|
Test (postgres:10)
The job was canceled because "postgres_12" failed.
|
Test (postgres:10)
The operation was canceled.
|
Test (postgres:14)
The job was canceled because "postgres_12" failed.
|
Test (postgres:14)
The operation was canceled.
|