Batch up scheduling of deferred deletions #5654
Triggered via pull request
December 6, 2024 16:27
Status
Cancelled
Total duration
1h 22m 43s
Artifacts
1
linux-ci.yml
on: pull_request
pre_job
2m 24s
linux-coverage
8m 36s
Matrix: linux-build-and-test
Linux CI Result
0s
Annotations
7 errors
linux-build-and-test (legacy)
Canceling since a higher priority waiting request for 'linux-ci-refs/pull/3030/merge' exists
|
linux-build-and-test (legacy)
The operation was canceled.
|
linux-build-and-test (vulkan)
Canceling since a higher priority waiting request for 'linux-ci-refs/pull/3030/merge' exists
|
linux-build-and-test (vulkan)
The operation was canceled.
|
linux-build-and-test (drawable)
Canceling since a higher priority waiting request for 'linux-ci-refs/pull/3030/merge' exists
|
linux-build-and-test (drawable)
The operation was canceled.
|
Linux CI Result
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
coverage-report
|
456 KB |
|