Skip to content

Batch up scheduling of deferred deletions #5633

Batch up scheduling of deferred deletions

Batch up scheduling of deferred deletions #5633

Triggered via pull request December 2, 2024 18:14
Status Cancelled
Total duration 50m 54s
Artifacts 1

linux-ci.yml

on: pull_request
Matrix: linux-build-and-test
Linux CI Result
0s
Linux CI Result
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 1 warning
linux-build-and-test (vulkan)
Canceling since a higher priority waiting request for 'linux-ci-refs/pull/3030/merge' exists
linux-build-and-test (vulkan)
The operation was canceled.
linux-build-and-test (legacy)
Canceling since a higher priority waiting request for 'linux-ci-refs/pull/3030/merge' exists
linux-build-and-test (legacy)
The operation was canceled.
linux-build-and-test (drawable)
Canceling since a higher priority waiting request for 'linux-ci-refs/pull/3030/merge' exists
linux-build-and-test (drawable)
The operation was canceled.
Linux CI Result
Process completed with exit code 1.
linux-build-and-test (vulkan)
Failed to save: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 1

Artifacts

Produced during runtime
Name Size
coverage-report
456 KB